Academic Projects
Evans Chemistry Lab
Location
• Ohio State University
Architecture
• 3 - Native BACnet Delta Control Units with 2 remote
ORCAview OWSs
• Total I/O: 121 Points
Highlights
• BACnet IP (Annex J.) over WAN/Internet
• Dedicated local high speed (10Mbps) network
• First BACnet IP project at the Ohio State University
• Monitoring / Control of main systems (heat
exchangers, chillers, AHUs)
• GUI (graphic user interface) with full animation
The Ohio State University
Location
With over 260 buildings and 13 million square feet, The Ohio State University continues to utilize BACnet based systems. BCI has installed Delta Controls in over 25 buildings and has integrated with 8 different BACnet manufacturers. The campus wide WAN was used for interconnectivity of all buildings and a centrally located Delta web-server permits non-proprietary external connections.
Granville MS/HS
Location
• Granville, Ohio
Architecture
• 2 - Native BACnet Alerton LAN System Integrator with 42
Visual Logic Controllers and 1 local BACtalk OWS
• Total I/O: 350+ Points
Highlights
• Control of 6 RTUs, 32 VAV boxes, 11 AHUS, 4 boilers,
1 chiller, 1 tower
• Critical monitoring and control of humidity
• Integral multiple building Office/HVAC High Speed
(100Mbps) Network
• File server architecture with multiple PCs, all with GUI
(graphic user interface)
Granville School District
Location
• Granville, Ohio
BCI installed Delta Controls district wide for Granville, Ohio. The system included the installation of controls in 5 buildings and the integration of BACnet with 2 different manufacturers. The district wide WAN was used for interconnectivity of all buildings and a centrally located Delta web-server permits non-proprietary external connections.
Copyright 2006 BCI, Inc. All Rights
Reserved.
|