“ BCI is committed to customer service excellence and is passionate about their business.”

— John Gunther
Roy Jorgensen Associates

 


Academic Projects

Evans Chemistry Lab

Location
• Ohio State University

Architecture
• 3 - Native BACnet Delta Control Units with 2 remote
  ORCAview OWSs
• Total I/O: 121 Points

Highlights
• BACnet IP (Annex J.) over WAN/Internet
• Dedicated local high speed (10Mbps) network
• First BACnet IP project at the Ohio State University
• Monitoring / Control of main systems (heat
  exchangers, chillers, AHUs)
• GUI (graphic user interface) with full animation


The Ohio State University

Location
With over 260 buildings and 13 million square feet, The Ohio State University continues to utilize BACnet based systems. BCI has installed Delta Controls in over 25 buildings and has integrated with 8 different BACnet manufacturers. The campus wide WAN was used for interconnectivity of all buildings and a centrally located Delta web-server permits non-proprietary external connections.


Granville MS/HS

Location
• Granville, Ohio

Architecture
• 2 - Native BACnet Alerton LAN System Integrator with 42
  Visual Logic Controllers and 1 local BACtalk OWS
• Total I/O: 350+ Points

Highlights
• Control of 6 RTUs, 32 VAV boxes, 11 AHUS, 4 boilers,
  1 chiller, 1 tower
• Critical monitoring and control of humidity
• Integral multiple building Office/HVAC High Speed
  (100Mbps) Network
• File server architecture with multiple PCs, all with GUI
  (graphic user interface)



Granville School District

Location
• Granville, Ohio

BCI installed Delta Controls district wide for Granville, Ohio. The system included the installation of controls in 5 buildings and the integration of BACnet with 2 different manufacturers. The district wide WAN was used for interconnectivity of all buildings and a centrally located Delta web-server permits non-proprietary external connections.



Copyright 2006 BCI, Inc. All Rights Reserved.